Hae
Aineistot 1-1 / 1
双钻头自平衡钻进系统用多通道连续缆管设计
(China Coal Research Institute, 2023-04)
- article
The problems, such as low drilling efficiency, large disturbance to the hole wall and long assistance time of tripping caused by the “long arm jurisdiction” drive of the ground drilling rig to the underground drill bit, ...