Development of a digital twin for real-time simulation of a combustion engine-based power plant with battery storage and grid coupling

Artikkeli
Osuva_Söderäng_Hautala_Mikulski_Storm_Niemi_2022.pdf - Lopullinen julkaistu versio - 8.09 MB

Kuvaus

© 2022 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
Coordinated control of combustion engine-based power plants with battery storage is the next big thing for optimising renewable energy. Digital twins can enable such sophisticated control but currently are too simplistic for the required insight. This study explores the feasibility of a fully physics-based combustion engine model in real-time co-simulation with an electrical power plant model, including battery storage. A detailed, crank-angle resolved, one-dimensional model of a large-bore stationary engine is reduced to a fast-running model (FRM). This engine digital twin is coupled with a complete power plant control model, developed in Simulink. Real-time functions are tested on a dedicated rapid-prototyping system using a target computer. Measurement data from the corresponding power plant infrastructure provide validation for the digital twin. The model-in-the-loop simulations show real-time results from both the standalone combustion and electric submodels mostly within 5% of measured values. The model coupling for fully predictive simulation was tested on a desktop computer, showing expected functionality and validity within 4% and 8% of the respective measured generator and converter outputs. However, execution time of the FRM needs reducing when moving to final hardware-in-the-loop implementation of a complete power plant model.

Emojulkaisu

ISBN

ISSN

1879-2227
0196-8904

Aihealue

Kausijulkaisu

Energy Conversion and Management|266

OKM-julkaisutyyppi

A1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä