Optimal expansion planning of active distribution system considering coordinated bidding of downward active microgrids and demand response providers

dc.contributor.authorQaeini, Saeed
dc.contributor.authorNazar, Mehrdad Setayesh
dc.contributor.authorYousefian, Morteza
dc.contributor.authorHeidari, Alireza
dc.contributor.authorShafie-khah, Miadreza
dc.contributor.authorCatalão, João P. S.
dc.contributor.departmentfi=Ei tutkimusalustaa|en=No platform|-
dc.contributor.facultyfi=Tekniikan ja innovaatiojohtamisen yksikkö|en=School of Technology and Innovations|-
dc.contributor.orcidhttps://orcid.org/0000-0003-1691-5355-
dc.contributor.organizationfi=Vaasan yliopisto|en=University of Vaasa|
dc.date.accessioned2019-10-23T11:56:35Z
dc.date.accessioned2025-06-25T12:21:07Z
dc.date.available2019-10-23T11:56:35Z
dc.date.issued2019-03-14
dc.description.abstractThis paper addresses an integrated framework for expansion planning of an Active Distribution Network (ADS) that supplies its downward Active MicroGrids (AMGs) and it participates in the upward wholesale market to sell its surplus electricity. The proposed novel model considers the impact of coordinated and uncoordinated bidding of AMGs and Demand Response Providers (DRPs) on the optimal expansion planning. The problem has six sources of uncertainty: upward electricity market prices, AMGs location and time of installation, AMGs power generation/consumption, ADS intermittent power generations, DRP biddings, and the ADS system contingencies. The model uses the Conditional Value at Risk (CVaR) criterion in order to handle the trading risks of ADS with the wholesale market. The proposed formulation integrates the most important deterministic and stochastic parameters of the risk-based expansion planning of ADS that is rare in the literature on this field. The introduced method uses a four-stage optimization algorithm that uses genetic algorithm, CPLEX and DICOPT solvers. The proposed method is applied to the 18-bus and 33-bus test systems to assess the proposed algorithm. The proposed method reduces the aggregated expansion planning costs for the 18-bus and 33-bus system about 44.04%, and 11.82% with respect to the uncoordinated bidding of AMGs/DRPs costs, respectively.-
dc.description.reviewstatusfi=vertaisarvioitu|en=peerReviewed|-
dc.format.bitstreamtrue
dc.format.contentfi=kokoteksti|en=fulltext|-
dc.format.extent14-
dc.format.pagerange1291-1303-
dc.identifier.olddbid10472
dc.identifier.oldhandle10024/9777
dc.identifier.urihttps://osuva.uwasa.fi/handle/11111/94
dc.identifier.urnURN:NBN:fi-fe2019102334452-
dc.language.isoeng-
dc.publisherInstitution of Engineering and Technology-
dc.relation.doi10.1049/iet-rpg.2018.6006-
dc.relation.ispartofjournalIET Renewable Power Generation-
dc.relation.issn1752-1424-
dc.relation.issn1752-1416-
dc.relation.issue8-
dc.relation.urlhttps://doi.org/10.1049/iet-rpg.2018.6006-
dc.relation.volume13-
dc.source.identifierWOS: 000470937800008-
dc.source.identifierScopus: 85067037659-
dc.source.identifierhttps://osuva.uwasa.fi/handle/10024/9777
dc.subjectexpansion planning-
dc.subjectactive distribution system-
dc.subjectstochastic programming-
dc.subjectmicrogrids-
dc.subjectoptimization-
dc.subject.disciplinefi=Sähkötekniikka|en=Electrical Engineering|-
dc.titleOptimal expansion planning of active distribution system considering coordinated bidding of downward active microgrids and demand response providers-
dc.type.okmfi=A1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä|en=A1 Peer-reviewed original journal article|sv=A1 Originalartikel i en vetenskaplig tidskrift|-
dc.type.publicationarticle-
dc.type.versionsubmittedVersion-

Tiedostot

Näytetään 1 - 1 / 1
Ladataan...
Name:
Osuva_Shafie-khah_2019a_optimal.pdf
Size:
3.43 MB
Format:
Adobe Portable Document Format
Description:
Artikkeli

Kokoelmat