Hyppää sisältöön
    • Suomeksi
    • In English
  • Suomeksi
  • In English
  • Kirjaudu
Näytä aineisto 
  •   Etusivu
  • OSUVA
  • Artikkelit
  • Näytä aineisto
  •   Etusivu
  • OSUVA
  • Artikkelit
  • Näytä aineisto
JavaScript is disabled for your browser. Some features of this site may not work without it.

Peer-to-peer energy trading between wind power producer and demand response aggregators for scheduling joint energy and reserve

Vahedipour-Dahraie, Mostafa; Rashidizadeh-Kermani, Homa; Shafie-khah, Miadreza; Siano, Pierluigi (2020-04-28)

 
Katso/Avaa
article (1.474Mb)
Lataukset: 

URI
https://doi.org/10.1109/JSYST.2020.2983101

Vahedipour-Dahraie, Mostafa
Rashidizadeh-Kermani, Homa
Shafie-khah, Miadreza
Siano, Pierluigi
IEEE
28.04.2020
doi:10.1109/JSYST.2020.2983101
Näytä kaikki kuvailutiedot
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi-fe2020060841017

Kuvaus

vertaisarvioitu
©2020 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works.
Tiivistelmä
In this article, a stochastic decision-making framework is presented in which a wind power producer (WPP) provides some required reserve capacity from demand response aggregators (DRAs) in a peer-to-peer (P2P) structure. In this structure, each DRA is able to choose the most competitive WPP, and purchase energy and sell reserve capacity to that WPP under a bilateral contract-based P2P electricity trading mechanism. Based on this structure, the WPP can determine the optimal buying reserve from DRAs to offset part of wind power deviation. The proposed framework is formulated as a bilevel stochastic model in which the upper level maximizes the WPP's profit based on the optimal bidding in the day-ahead and balancing markets, whereas the lower level minimizes DRAs' costs. In order to incorporate the risk associated with the WPP's decisions and to assess the effect of scheduling reserves on the profit variability, conditional value at risk is employed.
Kokoelmat
  • Artikkelit [2026]
https://osuva.uwasa.fi
Ota yhteyttä | Tietosuoja | Saavutettavuusseloste
 

 

Tämä kokoelma

TekijäNimekeAsiasanaYksikkö / TiedekuntaOppiaineJulkaisuaikaKokoelmat

Omat tiedot

Kirjaudu sisäänRekisteröidy
https://osuva.uwasa.fi
Ota yhteyttä | Tietosuoja | Saavutettavuusseloste